Our process

How we work: building your fence from first photo to handover

We build the whole fence – groundwork, wall, posts and panels – in a fixed sequence, with one person in charge and an itemised quote before anything starts.

Our fence building process is the sequence of assessment, setting out, itemised quoting, excavation, foundations, wall or post installation, infill fitting and handover through which we deliver a complete boundary fence as a single contract.

How does it start?

In short: with photos and an approximate length, sent by form or WhatsApp – no commitment.

The quickest start is a set of photos of the line from both ends and from a few points in between, plus a rough length in metres and a sentence about what the fence should do. Add anything you know about rules in your community and whether there is an old fence to remove.

From that we can usually tell you which fence types make sense, what questions remain open and whether we need to see the site. Not in Spain? Send photos and the approximate length – we can start with a remote assessment. You can reach us on WhatsApp at 613 656 443 or by e-mail at oficina@vallasmalaga.eu.

Why do we measure and set out before quoting?

In short: because the real line, the slopes and the ground decide the job, and they rarely match what a map suggests.

Measuring in linear metres sounds simple until the line meets a pine root, a drop of a metre at the end of the garden or a manhole cover nobody mentioned. On a visit we walk the line, note changes in level, existing walls and services, the access for deliveries and where spoil can go.

Setting out – the replanteo – means pegging the line on the ground with stakes and string so that you, and if relevant your neighbour, can see exactly where the fence will stand before anything is dug. Disputes over a few centimetres are far cheaper to settle at this point. For shared boundaries, see boundary fences with neighbours.

Setting out the fence line with stakes in woodland
Setting out the fence line with stakes in woodland

What does our quote contain?

In short: each stage as a separate line, so you know what you are paying for and can compare offers fairly.

Our quote is a presupuesto detallado por partidas: removal of any old fence, clearing, excavation, foundations, wall, pillars or posts, infill, finishing and clean-up, each listed on its own. If you are deciding between two fence types, we can price both.

The quote carries no commitment. Use it to decide, to compare and to talk to your neighbour or community. If you want to know how to read any fence quote, our sister site presupuestovalla.eu explains it in depth, and our article on contractor red flags shows what to watch for in other offers.

What happens on site?

In short: excavation and foundations first, then the wall or posts, then the infill – never the other way round.

Once you accept the quote and any permission is in place, the build follows a fixed order. We excavate post holes or a trench, adapting to rock or loose ground. We pour the footings and, for walls, the continuous foundation. We build the low wall and pillars or set the posts, checking line and level as we go. Only when the base has set do we fit the infill.

This order is not negotiable, because almost every failed fence we are asked to replace was built in a hurry: posts in shallow holes, panels hung before the concrete had set, walls without proper footings. Our article on what can go wrong when fences are chosen badly gives examples, and what working with us is really like describes the experience from the owner's side.

Mini digger excavating for a split-face block wall at a new house
Mini digger excavating for a split-face block wall at a new house

How do we work with owners who are not in Spain?

In short: by agreeing in writing how you want to be informed, who gives us access and how decisions are confirmed.

Many of the owners we work for divide their year between Spain and somewhere else. Before work starts we agree the practical points: who opens the property, where materials can be stored, which neighbour or agent is the local contact and how decisions on site are confirmed. You can ask for photo updates at the stages that matter to you – setting out, foundations and completion are the usual ones.

Our guide on managing works from abroad gives a fuller checklist, including what to check about permits and payments from outside Spain.

What is outside our scope?

In short: gates and automation, pool barriers, screening products, retaining walls, temporary site fencing and permit handling.

Being clear about scope avoids surprises. We do not supply or install gates or gate motors, though we can leave openings and pillars ready. We do not build pool safety barriers, supply reed or artificial hedge screening, or provide temporary site fencing. We do not design or build retaining walls; a technician has to design those. We do not prepare technical projects or process permits.

Within our scope – building complete fences, removing old fences and clearing the line as part of a new job – we take full responsibility from setting out to handover. See the full range on our fence types page.

BR
Bauman Raymond Attila
Author and person responsible · Last reviewed:
How we build it – step by step

How we build it – step by step

  1. Photos or visit

    You send photos, an approximate length and what the fence must do, or we arrange to see the site.

  2. Measurement and setting out

    We measure the line in linear metres and peg it out so everyone can see where the fence will stand.

  3. Itemised quote

    You receive a quote by stages, with no commitment, and can compare options.

  4. Permission and planning

    You or your representative obtain any municipal authorisation; we agree access, storage and updates.

  5. Removal and clearing

    Where needed, we take out the old fence and clear the line.

  6. Excavation and foundations

    We dig and pour footings or a continuous foundation suited to the ground.

  7. Wall, pillars or posts

    We build the base structure and check line and level along the whole run.

  8. Infill and finishing

    We fit panels, slats, mesh or sheet and complete caps and details.

  9. Cleaning and handover

    We clear the site, remove our waste and go through the finished fence with you or send photos.

When is it the right choice – and when not?

When is it the right choice – and when not?

A good fit if…

  • Owners who want one contractor responsible for the whole fence
  • Owners abroad who need clear written information
  • Projects with groundwork, a wall and an infill
  • Owners comparing several offers and wanting a quote they can read

Consider another option if…

  • Owners who only want materials delivered
  • Projects needing a technical project or structural design
  • Gate and automation installations
What affects the cost?

What affects the cost?

We don't publish fixed prices: every fence is quoted line by line using these factors.

  • Length in linear metres
  • Fence height
  • Type of infill
  • Low wall or posts only
  • Foundation type
  • Ground and slope
  • Access for materials
  • Removal of old fence
  • Clearing the line
  • Licence fees

Fence cost calculator See how a fence quote is put together

Itemised quoteItemisedquoteLinear metresHeightPanel typeLow wall or notFoundationsGround & slopeAccessOld fence removalClearingPermit
Our specialist sites by fence type
FAQ

Frequently asked questions

Do you visit every site before quoting?

Not always. Simple jobs can be assessed from good photos and measurements. Where slopes, access or the boundary are unclear, we visit.

Who is in charge on site?

One person is responsible for the whole fence, from setting out to handover, so you always know whom to ask.

Can I change the design after accepting the quote?

Yes, before the relevant stage is built. Because the quote is itemised, we can adjust the affected lines without redoing everything.

Do I need to be present during the work?

No. Many owners are abroad. We agree access, a local contact and how you want to be updated.

What do you need from me before starting?

Confirmation of the line, any municipal authorisation, access arrangements and a decision on finishes and colours.

Do you take away the waste?

Yes, we clear our own waste and spoil from the work area as part of the job, and removal of an old fence is listed in the quote.

Do you handle the permit?

No. You or your representative apply. Our itemised quote describes the work, which helps with the application.

Can you work with a builder or architect already on site?

Yes, if the fence is a separate package. We coordinate with them on levels, services and access.

What happens if you find rock or old foundations?

We tell you before continuing and explain the options. Ground conditions are one of the cost factors we flag in the quote.

How do I pay?

Payment terms are set out in the quote. Ask us to explain anything that is unclear before you accept.